TS Measuring and verification units
Royal Decree RD 3275/1982 on the technical conditions and safety guarantees in electrical power plants and substations is still in force. The said regulations establish the compulsory maintenance contracts required for the said installations before their commissioning. The maintenance activities in installations regulated by the regulations mentioned above can only be carried out by companies registered in the register of high-voltage installation maintenance companies (REMAT) of the Territorial Industry and Energy Service where they carry out their activities. A series of requirements have been established in order to guarantee the conversion and maintenance tasks, which must be complied with by all highvoltage installations, in accordance with the regulations and MIE-RAT additional technical instructions. In addition, the owner must comply with all requirements related to the resolution of faults detected. A company that wishes to be registered in the REMAT must have the adequate technical resources, which will be used during the maintenance tasks.
![]() |
TL-6e Earth resistance meter P6062200A0000 |
![]() |
CR Series Relay tester CR |
![]() |
MH Series Microohmmeter MH |
![]() |
MHe Series Microohmmeters MHe |
![]() |
MI_MD Series Megaohmmeters MI_MD |
![]() |
TL-5 Series Earth resistance meter TL-5 |
![]() |
GETEST Series Indirect earth contact simulator GETEST |
![]() |
OT2-60D Dielectric strenght tester P6031200A0000 |
![]() |
OT-60D (consult availability) Dielectric strenght tester P60312. |
![]() |
CITI Series (consult availability) Technical inspection control in installations CITI |